The material for the construction of the ventilation wall for the indoor range was delivered Friday 8/25. We hope to start construction on that wall Saturday 8/26. (Tomorrow). We apologize for the short notice but we just received the "go ahead" on the final design from the engineer on Wednesday.
The work will consist of some batt insulation, rigid insulation, drywall, some wood framing, along with metal stud and track construction. We hope to work at least from 9:00AM until noon. Anyone that can help out will be welcome. Tools such as a tape, pencil, cordless drill or screw gun, stapler etc will be helpful.
We're on the home stretch with this project, lets "GET,R' DONE".

 